| |

Pictures of the fairing's pre-fit on RV-9
This fairing is a good looking aerodynamic cover to finish off the inside tip
(or root) of the elevator. This fairing is estimated to reduce turbulence
and the resulting drag to result in the effect of a 1 to 2 knot increase of
speed. The fairings can be installed with a quick pre-fit, sand and paint,
then install. Install by replacing 2 to 6 rivets with nutplates and screws
which will allow for easy removal for future inspections. Other options
would be to use a few pop rivets or do the proper prep and use a suitable
adhesive, making it quick and easy to install. Just drill a few larger
holes to relieve the fiberglass where the original rivets reside, don't drill
larger holes where you plan on putting the screws or pop rivets.

Before
installation
Raw fairings
_________________________________________________________________________________________
Elevator Inside Caps (2 pieces)

RV-10, (RV-10 not presently finished, SORRY!)
_________________________________________________________________________________________
Elevator / Outer Horizontal outer Fillers (4 pieces)
Proven to reduce drag by reducing airflow and
turbulence around the elevator. Effective results equal to a 1 to 3 knot
increase of speed. Assembly will be similar to the Inner Caps. May require
a little more during pre-fit to accommodate for differences and weights. Caution
will need to be taken to ensure that the install of these parts are solid with
no interferences, to avoid any potential lock-up of the elevator in flight due
to parts coming loose.

RV-10 (RV-10 not presently finished, SORRY!)
ORDER INDIVIDUALLY ABOVE or ORDER COMPLETE
SETS BELOW

|